Palouse Prairie Restoration Project – AE1624 September 4, 2018 Interdisciplinary Science Center – AE1464GC April 24, 2018 Huston Hall Generator – AE1617 July 11, 2017 Holter House Demolition – AE1613 June 23, 2017 Music Recital Hall Safety Rail – AE1612 June 22, 2017 Interim Multi Cultural Center – AE1611 May 30, 2017 Student Athlete Academic Success Center – AE1609 May 24, 2017 Chiller Plant Loading Dock Addition – AE1484G3 April 11, 2017 Housing 10-Year Master Plan – AE1555 February 16, 2017 Pence Union Renovation – AE1448 October 17, 2016 Thomas Hammer Relocation 16′ (JFK) – AE1545 October 17, 2016 Science Building Design – AE1468 July 29, 2016 STA Bus Routing – AE1550 July 4, 2016 Gym Floor Refinish 16′ – AE1546 June 30, 2016 Interdisciplinary Science Center (ISC) Design – AE1464 June 29, 2016 Showalter Toilet Room Renovation – AE1470 June 1, 2016 URC Arena Sound System 16’ – AE1532GC June 1, 2016 Showalter Stage Lighting Upgrade – AE1502 May 19, 2016 MAR/WLM Fire Alarms Upgrade- AE1492 May 19, 2016 Pavilion Ceiling and Lighting Study – Reese Court (PAV) – AE1528 May 18, 2016 Water Reservoir Recoating Project – AE1345G4 May 5, 2016 Water Distribution Improvements – AE1345G5 May 5, 2016 Steam Infrastructure Upgrade ’15-17 – AE1476 April 6, 2016 Dressler Sports Court – AE1380 March 1, 2016 Robert Reid Lab School Demolition – AE1427 February 29, 2016 Chilled Water Capacity Upgrade – AE1484 February 8, 2016 Electrical Capacity Upgrade – AE1483 February 8, 2016 Tunnel Transformer Replacement Zone 1 – AE1509 February 8, 2016 Rozell Parking Lot & Access Drive Reconstruction Project – AE1419 February 8, 2016 Well 2R Equipping Project – AE1345G3 December 2, 2015 Tawanka Dining Hall Entry – AE1409 November 19, 2015 Huston Hall HVAC – AE1473 October 13, 2015 Electric Charging Stations – AE1479 October 13, 2015 Cheney Hall Plastics & Fluids Lab Design – AE1433 September 17, 2015 Washington Street Improvements-Athletics – AE1375 July 31, 2015 Water System Capital Renewal Project – AE1345G2 July 30, 2015 Science II Predesign Study – AE1346 July 30, 2015 Elm Street Improvements – AE1396 July 30, 2015 Holter House Roof Replacement- AE1431 July 28, 2015 Gym Floor Refinish 15′- AE1459 July 23, 2015 Recycle Center (Phase II) – AE1370 April 14, 2015 Track Repair 2015 – AE1421 April 10, 2015 HSNG Booster Pumps – AE1426 March 10, 2015 Tawanka Dishwashing Area – AE1430 March 10, 2015 Housing Gallery Space- AE1428 March 2, 2015 Campus Security Master Plan – AE1418 January 19, 2015 Water System Capital Renewal Project – AE1345G1 November 25, 2014 Tawanka Kitchen Hood Replacement – AE1356 November 25, 2014 Huston Hall Remodel – AE1358 November 25, 2014 Theatre/Music/Showalter Stage Upgrade – AE1386 November 25, 2014